Multi-Link SR-2 Manual de instalación

Busca en linea o descarga Manual de instalación para Procesadores Multi-Link SR-2. Multi-Link SR-2 Installation manual Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 71
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
Installation Manual-A
Providing equipment and services to manage controlled-temperature environments for
food and other temperature-sensitive products, our Climate Control Technologies sector
encompasses both transport and stationary refrigeration solutions. Our product brands include
Thermo King®, a world leader in transport temperature control systems, and Hussmann®, a
manufacturer of refrigeration and food merchandising equipment.
www.thermoking.com www.hussmann.com www.ingersollrand.com
©2009 Ingersoll-Rand Company
Printed in U.S.A. on Recycled Paper
Trailer Edition
SPECTRUM
TM
DE SR-2
Multi-Temperature Systems
TK 53542-2-IM (Rev. 7, 06/12)
Vista de pagina 0
1 2 3 4 5 6 ... 70 71

Indice de contenidos

Pagina 1 - Installation Manual-A

Installation Manual-AProviding equipment and services to manage controlled-temperature environments for food and other temperature-sensitive products

Pagina 3 - Release History

10Evaporator Opening RequirementsEvaporator OpeningThe location of the unit mounting bolts and evaporator opening in the front wall is critical.VERIFY

Pagina 4

11Evaporator Opening Requirements

Pagina 5 - Introduction

12Mounting Hardware RequirementsMounting BoltsNOTE: The location of the unit mounting bolts in the trailer front wall is critical to proper unit insta

Pagina 6 - Table of Contents

13Mounting Hardware Requirements

Pagina 9

16Battery Selection GuideRefer to Service Bulletin T&T 446 for more information regarding Battery Selection and Maintenance.IMPORTANT: The specifi

Pagina 10 - Trailer Requirements

17Group 31 Battery Dimensions

Pagina 11 - Evaporator Opening

18Lifting Bar DimensionsI. Recommended material: 76.2 mm (3.00 in.) x 12.7 mm (0.50 in.) mild steel.II. Use forged chain links and hooks, clevis and p

Pagina 12

Installation Manual—ATrailer EditionSPECTRUM™ DE SR-2Multi-Temperature SystemsTK 53542-2-IM (Rev. 7, 06/12)Copyright© 2006 Thermo King Corp., Minneapo

Pagina 14

20Surface Mounted Status Light Dimensions (Option)Contact your Thermo King Dealer for specific part numbers.Standard Display and Fuel Combo DisplayTri

Pagina 15 - Unit Dimensions

21Flush Mounted Status Light Opening Dimensions (Option)Contact your Thermo King Dealer for specific part numbers.NOTE: Dimensions shown will accommod

Pagina 16 - BLANK PAGE

22Rear Remote Controller Dimensions (Option) Contact your Thermo King Dealer for specific part numbers.

Pagina 17 - Battery Selection Guide

23Door Switch Dimensions (Option)Contact your authorized Thermo King Dealer for specific part numbers.

Pagina 18 - Group 31 Battery Dimensions

24Required Tools1. Safety Glasses2. Drill3. Drill Bits4. Tape Measure5. Mechanics Tools6. Lifting Bar7. Work Platform (Recommended)8. Torque Wrench9.

Pagina 20

26Installation Components1. Locking Nuts2. Washers3. Self Tapping Screws4. Clamps5. Cable Ties6. Fuel Line Hose1/4 in.3/8 in.7. Fuel Line Fittings1/4

Pagina 21 - Triple Combo Display

27Installation Components

Pagina 22

28Unpacking the UnitUnits are shipped attached to disposable wooden pallet wrapped with protective cardboard and plastic stretch wrap.NOTE: To avoid u

Pagina 23

2Release HistoryReleased 08/06Rev. 1 (01/07) Updated art to show correct 8 wire remote controller harness, multiple door switch harness with diodes an

Pagina 24

29Unpacking the Unit

Pagina 25 - Required Tools

30Installing the UnitAccess to Mounting Holes (Detail II)1. Top side mounting hole through the hinged roadside grille.2. Center side mounting hole thr

Pagina 26

31 Installing the Unit

Pagina 27 - Installation Components

32Installing the Drain HosesInstalling the Drain Hoses1. Drain Hoses should run straight down the trailer wall from the unit with no kinks or bends.2.

Pagina 28

33Installing the Drain Hoses

Pagina 29 - Unpacking the Unit

34Installing the UFLS (Option)Important Installation InformationThe Ultrasonic Fuel Level Sensor (UFLS) should be installed into the fuel tank before

Pagina 30

35Installing the UFLS (Option)

Pagina 31 - Installing the Unit

36Installing the Fuel Tank - 50 Gallon, 22'' Diameter, AluminumOPEN STYLE TANK MOUNTING BRACKETIMPORTANT FUEL TANK INSTALLATION INFORMATIONE

Pagina 32 - Installing the Unit

37Installing the Fuel Tank - 50 Gallon, 22'' Diameter, AluminumOPEN STYLE TANK MOUNTING BRACKETStandard crossmember spacing shown. For other

Pagina 33 - Installing the Drain Hoses

38Installing the Fuel Tank - 50 Gallon, 22'' Diameter, AluminumOPEN STYLE TANK MOUNTING BRACKETFuel Tank InstallationNOTE: Location of mount

Pagina 34

3SPECTRUM DE SR-2 Multi-Temperature Systems

Pagina 35 - Installing the UFLS (Option)

39Installing the Fuel Tank - 50 Gallon, 22'' Diameter, AluminumOPEN STYLE TANK MOUNTING BRACKETOpen Style BracketFlangeOrient Tank Verticall

Pagina 36

40Installing the Fuel LinesFuel Line Installation1. Install the fuel line bracket to the pre-drilled hole in the frame. This hole is located in the fr

Pagina 37

41Installing the Fuel LinesVerify the factory installed fuel line fittings are tight prior to mounting the bracket onto the frame.

Pagina 38

42Installing the UFLS Harness (Option)“Solid State” Ultrasonic Fuel Level Sensor (UFLS)Harness Installation and RoutingNOTE: The Ultrasonic Fuel Level

Pagina 39 - Fuel Tank Installation

43Installing the UFLS Harness (Option)Ultrasonic Fuel Level Sensor (UFLS)Heat Shrink TubingCrimp and Solder Style Connectors Interconnect Harness

Pagina 40 - Vertically

44Installing the Status Light (Option)InstallationNOTE: Surface mounted status light installation shown, flush mounted light installs into recessed op

Pagina 41 - Installing the Fuel Lines

45Installing the Status Light (Option)4-Pin 8-Pin

Pagina 42

46DE Split-Evaporator Installation Return AirflowRestrictions of the return airflow adversely affects the performance of the unit. The area directly b

Pagina 43 - Harness Connections

47DE Split-Evaporator InstallationIII

Pagina 44 - Interconnect Harness

48DE Split-Evaporator InstallationSealing Air GapsNOTE: The following areas must be properly sealed to prevent air leakage and allow the unit to opera

Pagina 45 - Installation

4IntroductionInstallation Manual-A was written to assist with the installation of the Thermo King SPECTRUM DE SR-2 refrigeration systems onto trailers

Pagina 46

49DE Split-Evaporator Installation I II III

Pagina 47 - Bulkhead (Detail I)

50DE Split-Evaporator InstallationTypical DE Split-evaporator InstallationOnly one of many possible configurations is shown for the Spectrum DE applic

Pagina 48

51DE Split-Evaporator Installation 288.0 in.(7315 mm)24.00 in.(609 mm)AFD59148710295411316

Pagina 49 - Sealing Air Gaps

52Installing the Rear Remote Controller (Option)Foamed-In-Place InstallationNOTE: Verify mounting location and all dimensions before installing the re

Pagina 50 - I II III

53Installing the Rear Remote Controller (Option)

Pagina 51

54Installing the Rear Remote Controller (Option) Retro-Fit InstallationNOTE: Verify mounting location and all dimensions before installing the1. Cut o

Pagina 52

55Installing the Rear Remote Controller (Option)

Pagina 53 - Foamed-In-Place Installation

56Installing the Door Switch (Option)When installing CargoLink wireless door switches, see TK 55151 CargoLink Installation Manual. NOTE: These instruc

Pagina 54

57Installing the Door Switch (Option)Right Angle MountingTop x Top MountingSide x Side Mounting

Pagina 55 - Retro-Fit Installation

58Installing the Door Switch (Option)Contact your Thermo King Dealer for specific part numbers.NOTE: The Door Switch Harness Connectors are located at

Pagina 56

5Table of ContentsSafety Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6Trailer Requiremen

Pagina 57

59Installing the Door Switch (Option)Interface Harness Wiring Door Switch WiringRED = (12 Vdc) POWER RED = (12 Vdc) POWERBLACK = (CH) GROUND BLACK = (

Pagina 58 - Side x Side Mounting

60CargoWatch™ Sensor Locations (Option)Sensor locations for Domestic Applications as required by customer.1. Sensor #1 is located in the evaporator si

Pagina 59

61CargoWatch™ Sensor Locations (Option)

Pagina 60

62Connecting the CargoWatch™ Sensors (Option)NOTE: ONLY CargoWatch Sensors Can Be UsedCONNECTING SENSORSNOTE: The sensor are not polarity sensitive.1.

Pagina 61

63Connecting the CargoWatch™ Sensors (Option)

Pagina 62

64Installing the BatteryNOTE: Thermo King units are designed for one 12 volt, group 31 battery. The battery must be suitable for deep cycling, heavy d

Pagina 63

65Installing the BatteryStandard Battery Hold Down BracketOptional Heavy Duty Battery Hold Down Bracket

Pagina 64

66Installing the Bottom PanInstallationNOTE: Anti-seize lubricant applied to the threads of the stainless steel mounting hardware is recommended.1. Re

Pagina 65 - Installing the Battery

67Installing the Bottom PanMODEL 50 UNITS ONLYThe receptacle box needs to be lifted up to access one of the bottom pans front mounting bolts.

Pagina 66

68STOP!SPECTRUM DEMULTI-TEMPERATURESYSTEMS ONLY!TO INSTALL THE SPECTRUM REMOTE EVAPORATORS AND COMPLETE THIS INSTALLATION REFER TO:INSTALLATION MANUAL

Pagina 67 - Installing the Bottom Pan

6Safety PrecautionsThe symbol appears next to a point that is particularly important:DANGER: Addresses a circumstance that, if encountered, will lea

Pagina 68

69STOPCautionThermo King Multi-Temp host units are shipped with a 35 kPa (5 psi) holding charge of R-404A. This holding charge of approximately 1 kg (

Pagina 69 - SYSTEMS ONLY!

Installation Manual-AProviding equipment and services to manage controlled-temperature environments for food and other temperature-sensitive products

Pagina 70 - Recover Refrigerant

7Safety Precautions (continued)Battery Installation and Cable Routing RefrigerantFirst AidFROST BITE: In the event of frost bite, the objectives of F

Pagina 71

8Trailer RequirementsApproximate WeightSPECTRUM DE (1670 lbs.) to 885 kg (1950 lbs.)DANGER: The front trailer must be structurally strong enough to su

Comentarios a estos manuales

Sin comentarios